NYS&W Railway Northern Division Pictorial- Port Dickinson
Pictures are in date order.
July 3, 2000
After a DL&W bridge in Binghamton
was condemned, the NYS&W has shared a section of
track with the D&H. A passing cloud darkens this picture of Q432 coming
down the grade from the D&H connection and back onto NYSW iron.
Joshua K. Blay
November 17, 2002
BH2 with 3040, 3634 and caboose #0121 come off the
Utica main, bound for the NYS&W yard.
Joshua K. Blay
March 26, 2004
BH1, with pre-fabricated prison cells and general
freight, bound for Norwich.